Your first Friday note comes from us the week we start.
Before that comes the yard visit. Book it online, or call and tell us the address.

Studio to two bedrooms, one story or two
A new house on its own foundation behind yours, from a studio to two bedrooms, on one story or two. Water, sewer and power run out to it from the main house.
On every build
A detached back house is the one that changes the yard most. It stands on a foundation of its own, with its own roof and front door, usually somewhere between 450 and 1,000 sq ft. Where it can stand depends on the setbacks and the sewer line.
The city keeps a strip clear along the side and back property lines, called the setback. Inside that, the back house has to sit where the sewer line can reach it and where a concrete pump can reach the forms. On the yard visit we walk the spots you have in mind and agree which trees stay. Then we work out where the bin and the pump truck would go.

About an hour at your house, and it costs nothing. Three working days later the price reaches you in writing, with a schedule of the work and payment dates.
The sewer run and the panel can move the number as much as the finishes do, so we measure both on the yard visit. The permit and plan check fees belong to the city, so they sit outside our price. You pay them yourself, and your written estimate shows the figure from day one.
Yes, where the lot and your city's current rules allow it. Going up saves yard, and it adds a staircase and more structural work, which the written price shows.
Yes. One level, a step-free entry, a curbless shower, doorways wide enough for a walker and a path from the main house with no steps. Where the yard slopes, the path becomes a gentle ramp.
That's what the yard visit is for. If the setbacks, the slope or the sewer line leave no room, we say so on the visit and show you what does fit. Sometimes that's a garage conversion or a smaller unit, and sometimes it's nothing.
Trees you want to keep are fenced off before we dig. The bin goes on the driveway and the materials along the side yard, so most of the yard stays clear. Where we trench for the sewer and water lines, we fill the trench and rake it level before we leave.
Before that comes the yard visit. Book it online, or call and tell us the address.