ADU ProsLA(310) 362-0625Have us walk your yard
A single-story stucco house with a newer wing at its back corner that has its own wood front door off the driveway

ADUs and garage conversions in Ventura

ADUs and garage conversions in Ventura, behind the Midtown bungalows, out in Montalvo and Ondulando and on the water in the Keys. Call (310) 362-0625, or start with a phone photo of the spot.

A garage made into a home for a grown child comes out differently from one made for a parent. A grown child wants a real kitchen and a way in of their own, and a parent needs a shower with no step, so tell us which before anyone draws anything.

Then we ask how you'll live beside it, because you'll still be living in the main house and using the same driveway and side yard.

On every build

  • The first step is a free yard visit. It takes about an hour at your house, and your written estimate follows.
  • One project lead, one direct number. One project lead runs it from a free first visit to the day you move in.
  • Photos every Friday. Every Friday afternoon you get the week in writing, with photos of the work as it stands.
  • You approve every sheet of the drawings. We draw it with you and have it engineered, and the plan checker's corrections come back to us, not to you. The drawings and the city permit are part of the job.
  • Covered for a year, with a visit in month eleven. The warranty runs one year from the day the city issues the certificate of occupancy. In month eleven we come back, walk every room with you and write down anything that needs work.

Living beside the build in Midtown, Montalvo and the Keys

We're in the Keys and everything outside is damp by morning

Show us which side of the house catches the wind off the water.

The lumber along the side yard goes under a cover at the end of each day, so it isn't left sitting out in the damp.

Our dog and the neighbor's dog argue through the fence all day

Say which fence they meet at, and which door your dog uses. The open trench is the one thing in the yard a dog shouldn't find.

Where we trench for the sewer and water lines, we fill the trench and rake it level before we leave. Until then, keep the dog behind a closed gate.

Santa Ana days blow dust straight down off the hills

On those days shut the windows on the work side, and if someone in the house sleeps in the daytime, say which room.

Ask your project lead which days the digging falls on, because that's when the dust is worst.

New wall framing for a one-story backyard unit on a fresh slab, across an open dirt yard from the corner of a stucco house

The first step is a free yard visit.

About an hour at your house, and it costs nothing. After the visit, the price reaches you in writing, with a schedule of the work and payment dates.

Before the yard visit in Midtown or Montalvo

  • Take a picture from the back step. A phone photo of the spot you have in mind helps us plan the visit.
  • Know who it's for. A parent changes the doorways and the shower. For a tenant we think hardest about where their door goes, and a desk changes little at first. If you'd like to read more first, we go through who's moving in and what each one changes.
  • Tell us if a loan is paying for it. We'll line up the payment dates with the weeks your lender pays out.
  • Think about where the car goes. If it lives in the garage now and the garage is the place you have in mind, it will need a new spot once the work starts.

Ventura prices, and what changes them

Roughly, a garage conversion runs about $100,000 to $180,000, and a back house about $250,000 to $450,000. A junior ADU is about $90,000 to $160,000, and an attached unit about $180,000 to $320,000.

  • Whether the panel needs an upgrade. If you've put in a car charger since you moved in, tell us when you call. Your main panel may need upgrading first, or a smaller second panel for the new place may do.
  • Whether the new place needs a sewer pump. If the waste can't drain away downhill, a pump goes in, and your written estimate tells you.
  • Whether you can stand up comfortably in the garage. If the garage behind your bungalow feels low inside, tell us, because raising the ceiling moves the price.

City fees go from you straight to the city, outside our price.

A detached garage whose old door opening is filled in with sage-green siding, a wood front door and a window

Your driveway in Midtown and Montalvo during the build

  • A Midtown bungalow with the garage at the back. Deliveries stop at the street and come down the drive, so tell us if your car needs to get out in the morning.
  • A house in Montalvo or Ondulando. If your cars park on the driveway, tell us how many, and when they come and go, because the deliveries use the same driveway.

Call (310) 362-0625, or book a free yard visit and send us the photo of the spot ahead of it.

FridayWeek 1 of your build
From your project leadEvery Friday until you move in

Your first Friday note comes from us the week we start.

Before that comes the yard visit. Book it online, or call and tell us the address.

Have us walk your yard

About an hour at your house, and it costs nothing.

Your details for the yard visit

Anything we should plan around, like a walker or a tree you want to keep.

Add your name, email, photos or address

Optional. Up to 3 photos of the job, 10 MB each.

or call (310) 362-0625

Expect our call shortly.