ADU ProsLA(310) 362-0625Have us walk your yard
A two-story backyard home with white stucco below, dark wood siding above and lavender planted in gravel

ADUs and garage conversions in Lakewood

ADUs and garage conversions in Lakewood, behind the single-story houses of Mayfair and the rest of the city, with photos of the work every Friday. Call (310) 362-0625 about a garage conversion or a back house.

If the garage at the back of your drive is going to be a home for a parent, the front door and the shower get drawn for them. A grown child would want it laid out another way, so tell us who it's for.

You keep living in the house the whole time, so we also ask how your days go, like who drives out early and who sleeps late.

On every build

  • The first step is a free yard visit. It takes about an hour at your house, and your written estimate follows.
  • One project lead, one direct number. One project lead runs it from a free first visit to the day you move in.
  • Photos every Friday. Every Friday afternoon you get the week in writing, with photos of the work as it stands.
  • You approve every sheet of the drawings. We draw it with you and have it engineered, and the plan checker's corrections come back to us, not to you. The drawings and the city permit are part of the job.
  • Covered for a year, with a visit in month eleven. The warranty runs one year from the day the city issues the certificate of occupancy. In month eleven we come back, walk every room with you and write down anything that needs work.

A small house, a full driveway and everyone still at home

The kids share the bedroom on the driveway side

Show us their window, and tell us when they go to bed and when the little one naps, so your project lead knows from the start.

If the noise lands at the wrong time, call your project lead's direct number.

Our house has one bathroom. Will we lose the water?

Tell us who's home in the daytime, and whether anyone there can't be without water or power, even for a few hours.

The water or the power goes off only when we tie the new lines in, and the Friday note the week before tells you which day.

A detached garage whose old door opening is filled in with sage-green siding, a wood front door and a window

The first step is a free yard visit.

About an hour at your house, and it costs nothing. After the visit, the price reaches you in writing, with a schedule of the work and payment dates.

Down the driveway in Mayfair

  • The bin shares the driveway with your car. It sits on your driveway and is swapped before it overflows. If you need the car out every morning, tell us, because the two have to share the space.
  • The lumber goes along the side of the house. It comes up the driveway and goes along the side yard, under a cover at the end of each day.
  • On the morning the concrete comes, move the car the night before. On pour morning the pump hose runs up the driveway to the back, so the driveway is busy until the pour is done.

Who's moving into the garage, and what changes

  • A parent needs it all on one level. We keep the front door free of steps, put in a shower with no ledge to step over, and make the doorways wide enough for a walker. Walk the path from your back door to the garage with us, and read our page on detached ADUs first.
  • A grown child wants some distance. The garage at the far end of the drive is already as far from your bedroom as the yard gets. A garage conversion gives them their own door and their own kitchen.
  • A tenant walks the same driveway you do. Think about where they'll leave their car and their trash cans before we come out. If you'd rather they didn't pass your windows, our page on attached ADUs shows a unit with a door of its own.
  • An office for you can go inside the house. A junior ADU made inside the main house keeps the garage for the car, and the yard stays as it is.
A single-story stucco house with a newer wing at its back corner that has its own wood front door off the driveway

The price, and what moves it on a Lakewood yard

Roughly, a garage conversion runs about $100,000 to $180,000, and a back house about $250,000 to $450,000. A junior ADU is about $90,000 to $160,000, and an attached unit about $180,000 to $320,000.

  • Whether the ceiling has to come up. If your garage ceiling is low, say so when you call, and we measure it on the yard visit.
  • Whether the sewer needs a pump. If the new place sits too low for its waste to run downhill, it needs a small pump, and your written estimate says so.
  • Whether your panel is already full. If the house has been added onto, the panel may have no room left, and then the main panel gets upgraded first, with a smaller panel for the new place after that. Tell us what you know about it.

City fees go from you straight to the city, outside our price.

Call (310) 362-0625, or book a free yard visit on a day you're all home.

We also work nearby in Long Beach.

FridayWeek 1 of your build
From your project leadEvery Friday until you move in

Your first Friday note comes from us the week we start.

Before that comes the yard visit. Book it online, or call and tell us the address.

Have us walk your yard

About an hour at your house, and it costs nothing.

Your details for the yard visit

Anything we should plan around, like a walker or a tree you want to keep.

Add your name, email, photos or address

Optional. Up to 3 photos of the job, 10 MB each.

or call (310) 362-0625

Expect our call shortly.